14
11
9
7
5. Identify rocks number 1, 2, 3, 4 and 5. These rocks
have pegs that
fi
t in the holes on top of the rock
base. Install these rocks positioning them so the
arrow embossed underneath points to the front of
the
fi
replace.
6. Identify rocks number 15 and 16 and place them on
the rock base, on each side of the back row.
7. Identify rocks 6, 8, 10, 12 and 13. These rocks
have two holes that
fi
t on the pegs of the ceramic
platform. Install these rocks positioning them so the
arrow embossed underneath points to the front of
the
fi
replace.
14
11
9
7
17
18
13
6
8
10
8. Identify the rocks 7, 9, 11 and 14. These rocks
have one hole underneath and
fi
t on the peg of
the rocks 6, 8, 10 and 13 respectively. Install these
rocks positioning them so that the arrow embossed
underneath points to the front of the
fi
replace.
Rock combinations:
7 on top of 6
9 on top of 8
11 on top of 10
14 on top of 13
The rock 12 remains on its own.
9. Slightly rotate rocks 7 and 11 forward so they rest
on the rocks to their left.
Slightly rotate rock 14 forward so it rests on the rock
to its right.
10.
Optional:
Install the rocks 17 and 18 on the
platform. They can be placed on each side of the
rock pile as suggested or elsewhere on the platform.
1
2
3
4
5
13
15
12
10
16
8
6
Installation
32
QUALIFIED
INSTALLER
Summary of Contents for Legend G3.5 700IN
Page 44: ...44...