Valor APR-101012 Series User Manual Download Page 7

Page 7 of 14 

GEN2-V1 12ft-Instructions (Severe Weather) doc:r1 

MARKING YOUR AWNING POSITION: 

 

On a Header Board: 

Once your Header Board is secured to the wall mark the vertical centre of the header board on each end; use a 
plumb line to clearly mark this line across the full width of the header board. Also measure to find and mark the 
horizontal centre of the board. 
 

On masonry, or other surface. 

The Awning height should have already been marked on the wall, that mark is the upper most point of the Awning. To 
find the vertical centre for the mounting point, measure down from your mark 6.25in (159mm). Measure this position 
at both ends when the Awning will be located. Mark the horizontal centre where the Awning will be located. 

 

Header Board

Mark Horizontal Centre Line

Mark Vertical Centre Line

Vertical Centre Plumb Line

Vertical Centre Plumb Line

Mark Vertical Centre Line

 

 

 
MARKING & DRILLING FOR MOUNTING BOLTS: 

For either installation method above, measure 

63.50in. (1613mm)

 from the horizontal centre line to the left, and mark 

this point on the center plumb line already marked. Measure the 

63.50in. (1613mm)

 from the horizontal centre line to 

the right a mark this point on the plumb line.  

 

Header Board

Vertical Centre Plumb Line

Vertical Centre Plumb Line

Measure & Mark LEFT bracket
spacing from Horizontal
Centre Line.

Measure & Mark RIGHT bracket

spacing from Horizontal

Centre Line.

Mark Horizontal Centre Line

63.50in / 1613mm

63.50in / 1613mm

 

Mark LEFT SIDE MOUNTING BRACKET: 

Using the BRACKET HOLE TEMPLATE, from this package place the template with the LEFT SIDE INTERSECTION 
point over the intersection of the lines marked for the LEFT SIDE of the Awning. Ensure that the centre Line is 
straight over the plumb line marked on the wall. Use a pencil and push through the centre points for the bolts so as to 
mark the wall on the LEFT Side 

 
Mark RIGHT SIDE MOUNTING BRACKET:

 

Take the BRACKET HOLE TEMPLATE, from this package and place the template with the RIGHT SIDE 
INTERSECTION point over the intersection of the lines marked for the RIGHT SIDE of the Awning. Ensure that the 
centre Line is straight over the plumb line marked on the wall. Use a pencil and push through the centre points for the 
bolts so as to mark the wall on the LEFT Side. 

 
 

Summary of Contents for APR-101012 Series

Page 1: ...ion for all assembly and installation instructions set up adjustment and troubleshooting instructions There you will be able to see common problems and how to rectify them usually with a simple adjust...

Page 2: ...h a carbide masonry drill bit This will essentially use the header board to provide the level surface for the awning but will use the greater strength of the masonry wall for holding power You may con...

Page 3: ...RETRACTABLE AWNING SCHEMATIC DRAWING Size 10 ft Projection X 12 ft Width Diagram Exploded View 12 LEFT BRACKET ASSEMBLY 13 RIGHT BRACKET ASSEMBLY GEAR MECH ROLLER TUBE SUPPORT BRACKET ROLLER TUBE SUP...

Page 4: ...ssembly 1 14 40x40x240mm Torsion Bar w plastic end caps 1 15 Wall Brackets w hardware 2 16 Extension Arm Shoulder Bracket w hardware 1 17 Extension Arm Pivot Mount w hardware 1 18 Wrist Pin Assembly w...

Page 5: ...to determine the location of the awning Go to Additional Material Hardware Requirements above for fastening options Non Masonry Surface Installation As the awning is quite heavy and the forces put on...

Page 6: ...mum of 1 1 2 to 2 38 51mm of unobstructed clearance above this point 9 MOUNTING A HEADER BOARD The Awning Height reference is the upper most point of the Awning Fabric after installed The mounting bra...

Page 7: ...mark this point on the center plumb line already marked Measure the 63 50in 1613mm from the horizontal centre line to the right a mark this point on the plumb line Header Board Vertical Centre Plumb...

Page 8: ...ounting to it from the LEFT WALL BRACKET ASSEMBLY 3 Remove the three Allen bolts that are securing the GEAR MECHANISM to the support bracket and move it to the opposite side of the ROLLER SUPPORT BRAC...

Page 9: ...Line Vertical Centre Plumb Line Set the Intersection point labeled L over the Vertical Line and the Plumb line Align Plumb Line marked on the Wall or Header the Plumb Line on the Template Mark the Cen...

Page 10: ...to collapse and re insert in the hole Using a 5 8 wrench or adjustable wrench tighten each bolt until snug DO NOT OVERTIGHTEN THESE BOLTS ON masonry if you find that each bracket is not laying flush o...

Page 11: ...ller tube carefully slide the fabric into the channel be sure not to damage the fabric on the ends of the aluminum tube ends Centre the fabric on the Roller tube the fabric should be approximately 5cm...

Page 12: ...refully open the box and find the LEFT and the RIGHT Extension Arm Each arm is Labeled LEFT and RIGHT and each or them indicates TOP meaning that top should face upwards when installing the part Remov...

Page 13: ...on each end it will be difficult to make other adjustments Ensure that the EXTENSION ARM PIVOT Bracket is mounted in the same hole on the LEFT and RIGHT Side Brackets Pivot adjustment can be achieved...

Page 14: ...channel on the bottom of the Valance Tube Be careful to ensure that you maintain even alignment of the end of the Valance Tube and the Roller Tube while making this adjustment By moving the Wrist Ass...

Reviews: