GEN2-V1 12ft-Instructions (Severe Weather) doc:r1 

Installation on Masonry: 

A ½

” x 3” Sleeve Bolt has been included for mounting your awning on Brick, Stone, 

or Concrete surfaces. Use the 

“BRACKET DRILL PATTERN” template included in the 

package (small scale version shown to the right) to locate the position of all the holes. 
Be very careful to double check your dimensions before drilling. 
 
Using a ½” Carbide (Masonry) drill bit drill a minimum of 2-1/4” depth in each hole 
being careful to keep the holes as straight as possible. Once complete, blow any 
excess material out of each hole. 
 
Locate the WALL BRACKET that you have decided to install the GEAR MECHANISM on. Place this bracket over the 
holes just drilled and 

insert one 3/8” x 2-1/4” Sleeve Bolts through the bracket holes and into the holes just in the wall; 

it may be necessary to lightly tap them in with a hammer, if they are too tight remove the fastener and looseN off the 
bolt to allow the sleeve to collapse and re-insert in the hole. Using 

a 5/8” wrench or adjustable wrench, tighten each 

bolt until snug. 

DO NOT OVERTIGHTEN THESE BOLTS

. ON masonry if you find that each bracket is not laying 

flush on the surface you may wish to shim the back of the bracket to avoid damage and provide a secure mount. 
 

Installation on Header Board: 

Go to section “ADDITIONAL MATERIAL / HARDWARE REQUIREMENTS” and determine which fasteners you’ve 
chosen to use to install the Awning on the header board. The method and fastener that was selected will determine 
the diameter of the hole that that must be drilled as well as the hole depth. 
 
Once the holes have been drilled and the hardware has been acquired, place the Right and Left Brackets over the 
holes, insert the fastener and secure as per the recommendations provided with the fastener selected. 

 

Image below: Standard out of Box configuration, Left Side operation:

 

 
 

Image below: Converted to Right Side operation:

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Repeat the steps above for the other Wall Mounting Bracket without the Roller Tube Support Installed. 

BRACKET HOLE TEMPLATE

PLUMB LINE

PLUMB LINE

CENTRE  LI NE

BRACKET HOLE TEMPLATE

PLUMB LINE

PLUMB LINE

CENTRE  LIN E

 

 

 

 

Summary of Contents for APR-101012 Series

Page 1: ...ion for all assembly and installation instructions set up adjustment and troubleshooting instructions There you will be able to see common problems and how to rectify them usually with a simple adjust...

Page 2: ...h a carbide masonry drill bit This will essentially use the header board to provide the level surface for the awning but will use the greater strength of the masonry wall for holding power You may con...

Page 3: ...RETRACTABLE AWNING SCHEMATIC DRAWING Size 10 ft Projection X 12 ft Width Diagram Exploded View 12 LEFT BRACKET ASSEMBLY 13 RIGHT BRACKET ASSEMBLY GEAR MECH ROLLER TUBE SUPPORT BRACKET ROLLER TUBE SUP...

Page 4: ...ssembly 1 14 40x40x240mm Torsion Bar w plastic end caps 1 15 Wall Brackets w hardware 2 16 Extension Arm Shoulder Bracket w hardware 1 17 Extension Arm Pivot Mount w hardware 1 18 Wrist Pin Assembly w...

Page 5: ...to determine the location of the awning Go to Additional Material Hardware Requirements above for fastening options Non Masonry Surface Installation As the awning is quite heavy and the forces put on...

Page 6: ...mum of 1 1 2 to 2 38 51mm of unobstructed clearance above this point 9 MOUNTING A HEADER BOARD The Awning Height reference is the upper most point of the Awning Fabric after installed The mounting bra...

Page 7: ...mark this point on the center plumb line already marked Measure the 63 50in 1613mm from the horizontal centre line to the right a mark this point on the plumb line Header Board Vertical Centre Plumb...

Page 8: ...ounting to it from the LEFT WALL BRACKET ASSEMBLY 3 Remove the three Allen bolts that are securing the GEAR MECHANISM to the support bracket and move it to the opposite side of the ROLLER SUPPORT BRAC...

Page 9: ...Line Vertical Centre Plumb Line Set the Intersection point labeled L over the Vertical Line and the Plumb line Align Plumb Line marked on the Wall or Header the Plumb Line on the Template Mark the Cen...

Page 10: ...to collapse and re insert in the hole Using a 5 8 wrench or adjustable wrench tighten each bolt until snug DO NOT OVERTIGHTEN THESE BOLTS ON masonry if you find that each bracket is not laying flush o...

Page 11: ...ller tube carefully slide the fabric into the channel be sure not to damage the fabric on the ends of the aluminum tube ends Centre the fabric on the Roller tube the fabric should be approximately 5cm...

Page 12: ...refully open the box and find the LEFT and the RIGHT Extension Arm Each arm is Labeled LEFT and RIGHT and each or them indicates TOP meaning that top should face upwards when installing the part Remov...

Page 13: ...on each end it will be difficult to make other adjustments Ensure that the EXTENSION ARM PIVOT Bracket is mounted in the same hole on the LEFT and RIGHT Side Brackets Pivot adjustment can be achieved...

Page 14: ...channel on the bottom of the Valance Tube Be careful to ensure that you maintain even alignment of the end of the Valance Tube and the Roller Tube while making this adjustment By moving the Wrist Ass...

Reviews: