8. PREPARING APPLIANCE FOR INSTALLATION
8.1 Appliance Preparation
1.
Remove any transit tape and packing and inspect
for any evidence of mishandling which might affect
the performance. Each unit is flame tested before it
leaves the factory and as a result there may be slight
discolouration around the burner ports.
2.
Disconnect the control linkage from the burner
unit by removing the shouldered screw which joins
the control linking bar to the control pivot unit.
See figure 9.
3.
Detach the burner unit from the convector
box by removing two screws - See figure 10.
Lift the burner unit clear.
4.
Fit the two small ‘U’ section seals to the
bottom edges of the convection box side
flanges (See figure 11).
5.
Fit the two lower case support brackets to
the convection box side flanges. See figure
12.
Page 17
INSTALLER GUIDE
Figure 12. Fitting lower
case support brackets
Figure 11. Fitting ‘U’ seals
Figure 10. Burner attachment points
Figure 9.Control Linkage