EASY INSTALLATION GUIDE

Step by step

December 2017

Summary of Contents for PRO-FEED 2020

Page 1: ...EASY INSTALLATION GUIDE Step by step December 2017...

Page 2: ...USEFULL FOR THE INSTALLATION Concrete drill with bit Air compressor to clean holes Metric measuring tape Epoxy or silicone glue Chalk line 110V socket available for charger...

Page 3: ...location that suits him best A distance of two meters in front of the station is required to position the Pro Feed Draw a line around the Pro Feed move it manually and then position the charging stati...

Page 4: ...e holes in the concrete The holes should all be at the same depth and not too deep so that the magnet is almost level with the concrete Clean the holes using compressed air Put epoxy glue or sillicone...

Page 5: ...ts by alternating the polarity to all the magnets Leave a distance of 2m between each magnet for a straight line and 1m when cornering Make layouts in a straight line as much as possible This will fac...

Page 6: ...ress Start Calibration The Pro Feed must turn 5 times on itself Then it is supposed to end its sequence in parallel position from departure If it is not parallel it must be pushed manually until it is...

Page 7: ...starts with 10 0 88 it is required by the company to connect remotely on the Pro Feed Adjust the date and time The code for advanced parameters is 2201 Go to WLAN Next WLAN Scan Choose your network E...

Page 8: ...CTING THE CHARGING STATION Take the wires from the charging station and insert them into the transformer box Connect the wires identified and in the connectors identified with the same polarity see pi...

Page 9: ...it is badly positioned it will have serious consequences on the configuration Step 6 1 TRAINING Select Setting Select Position Select Ref Position Press the pencil icon Move the Pro Feed manually by...

Page 10: ...awing of the magnets does not appear on the screen as straight as the plot is in reality Use the available correction tools rotation displacement alignment etc to correct the position of the reference...

Page 11: ...the first point between ref 1 and 2 see image below The last point should be in the middle of the 1 2 3 points triangle Select the last point and then press Park For each point of the trip press the...

Page 12: ...Step 9 LET S TRY IT Try the road Check if the pushing distance is good Check all the way to make sure the ProFeed does not come in contact with an object walls or any other things...

Page 13: ...nter the time Unselect the three fields Must be started by user Done for today No more drives when an error occures A good road should not have more than 1000m 3000 At this distance the battery should...

Page 14: ...e of reference Step 2 2 Installing the magnets path in the farm Step 3 Calibration of the motors Step 4 Connection the Pro Feed to the wi fi network Step 5 Connecting the charging station Step 6 Train...

Page 15: ...230 boulevard Industriel Saint Germain de Grantham Qu bec J0C 1K0 T l 1 819 395 4282 T l c 1 819 395 2030 Courriel info valmetal com 13C50 0195...