
BCs160VA
Nov. 15, 1997
SMART-PULP
Smart Consistency Transmitter
Figure 1.2.1d Load capacity
10
Load resistor
min
250
Ω
3.25 %Cs
COMM
COMM
MODE ENTER
ESC
+ -
Ω
Ω
Ω
Ω
Ω
Load resistance
Supply voltage V
840
750
500
415
250
0
17.5
20
21 23
28
30
35
1088
Operating zone
Figure 1.2.1e SMART-PULP’s Test and
HART® connections
mA
Test
+
Test
-
Figure 1.2.1c SMART-PULP electrical connections
SMART-PULP end of the connection cable wiring for remote operator
terminal, if the remote operator terminal is used.
SMART-PULP's operator terminal wiring connections,
remote or local.
*) open = 0, closed = 1
Load
Recipe
selection *)
Transmitter
housing
To control system
open = sampling ON
closed = sampling OFF
To NOVE
Sample valve ON/OFF
8 7 6 5
1 2 3 4
7 6 5 4 3
1 2
7
6
5 4 3 2 1
TE
24 V
0
0
0
1
1
0
0
2
0
1
0
3
1
1
0
4
0
0
1
5
1
0
1
6
0
1
1
7
1
1
1
8 =
recipe
number