![Valley ICON LINK Manual Download Page 7](http://html1.mh-extra.com/html/valley/icon-link/icon-link_manual_3236440007.webp)
7
3.
Then screw the antenna cable end onto the cell modem card as
shown in the photo below (gold screw connection)
4.
Use the included zip-ties to secure the wires neatly to the existing
Valley wires as needed.
5. Attach the RED (+12v) and RED/BLACK (GND) wires to the
SRB relay board J7 in the Valley panel as shown below.