FP1LM
Manoir
‐
Installation
and
Operation
Manual
35
Interior
offset
installation
Connection
to
a
masonry
chimney
1.
Cut
and
frame
the
holes
in
the
ceiling,
floor
and
roof
where
the
chimney
will
pass.
Use
a
plumb
bob
to
line
up
the
center
of
the
holes.
Make
sure
that
the
size
of
the
floor
and
ceiling
holes
are
in
accordance
with
the
chimney
manufacturer’s
instructions.
2.
From
below,
install
a
firestop
(B)
supplied
by
the
chimney
manufacturer
in
each
ceiling/floor
separation
through
which
the
chimney
will
pass.
At
the
attic
level,
install
a
radiation
shield
from
above
(D).
3.
Follow
the
chimney’s
manufacturers’
instructions
and
place
the
first
chimney
length
on
the
fireplace.
For
all
chimneys,
you
must
use
an
anchor
plate
(A)
supplied
by
the
chimney
manufacturer
before