![Valco Cincinnati LLD Manual Download Page 26](http://html1.mh-extra.com/html/valco-cincinnati/lld/lld_manual_849607026.webp)
3-8
ValcoMelton
Section 3 - Installation
MC036 - Low Level Detection Alarm/AutoRefill Systems
External Customer
Connections
Figure 3-8. Wiring Diagram for External Customer Connections
(LLD Alarm System)
080xx545-01
The AutoRefill LLD
Installation
Before installing the AutoRefill LLD system, carefully inspect the system for
damage incurred during shipment. If damage is discovered, contact your
shipper.
Mounting the Control Box
The control box should be mounted:
•
Close to both an electrical power outlet and to the glue tank
A 15-foot (5 M) probe cable and 7.5-
foot (2.5 M) power cable are supplied
with the AutoRefill LLD system.
To install the control box, follow these steps:
1.
Using the upper and lower mounting flanges of the unit, mount
the control box to a stationary (non-vibrating) support.
Summary of Contents for LLD
Page 4: ......
Page 8: ...1 2 ValcoMelton Section 1 Introduction MC036 Low Level Detection Alarm AutoRefill Systems ...
Page 38: ...5 2 ValcoMelton Section 5 Maintenance MC036 Low Level Detection Alarm AutoRefill Systems ...
Page 40: ...6 2 ValcoMelton Section 6 Troubleshooting MC036 Low Level Detection Alarm AutoRefill Systems ...
Page 42: ...7 2 ValcoMelton Section 7 Specifications MC036 Low Level Detection Alarm AutoRefill Systems ...
Page 56: ......