Initial
checks before
turning
the boiler on
Check supply pipes
Ensure cold water shut off valve
@
is open (this con be checked by opening
0
hot top
and ensuring water flows). Also check that both the flow and return central heating
service valves
CD
and
®
and the gas service valve
(j)
are open: (The flow, return
and gas service valves are open when the line marking is in the some direction os the
pipe).
The pressure relief valve
®
is provided for safety reasons and must not be interfered
with.
.
. i
1~.
;
.
~~
Summary of Contents for TURBOmax VUW 242/1E
Page 1: ...1 i 57166 ...
Page 15: ... 1 nm S 11 I 1 2 I l0 1 nml 8 I 0 11 3 2 I 86 nm 8 ...
Page 21: ...13 14 1 ...