Vaillant PFGHRD A5 - 12/12
- 6 -
5.
Mount the PFGHRD onto the flue outlet of
the boiler and onto the support bracket. Attach
to the support bracket with the fixings provided
and secure the flue clamp.
6.
Connect the water pipes. Use the correct
materials that can be combined with stainless
steel.
7.
Connect the flue system to the PFGHRD
in accordance with the boiler installation
instructions. Ensure the flue clamps are fitted
and secured. Ensure that the flue anchor
bracket attached to the PFGHRD is secured to
the flue system by the screw provided.
8.
Note that the overall flue length should not
exceed the figures shown in the table on page
3, to allow for the additional resistance of the
PFGHRD.
INSTALLATION