Set-up 4
0020250180_00 geoTHERM Installation and maintenance instructions
13
4.6
Minimum clearances
A
C
B
B
D
The product is securely mounted on a wall.
Minimum clearance
to the uniTOWER
and domestic hot
water cylinder
Minimum clearance
to the MEH 60, MEH
61 and gas-fired
wall-hung boiler
A
200 mm
B
300 mm
100 mm
C
500 mm
D
600 mm
▶
Comply with the minimum clearances specified in order
to facilitate maintenance work.
If the product is mounted next to the uniTOWER accessory
module, a clearance of 300 mm must be maintained.
If the product is mounted next to the MEH61/60 accessory
module, a clearance of 100 mm must be maintained.
4.7
Using the mounting template
Note
A mounting template is supplied with the product
to aid wall mounting.
1.
Position the mounting template vertically over the in-
stallation site.
2.
Attach the template to the wall, using tacks for example.
3.
Mark the drill holes for the unit mounting bracket on the
wall.
4.8
Wall-mounting the product
1
3
2
Danger!
Risk of accidents as a result of insuffi-
cient load-bearing capacity of the fixing
means.
If the fixing elements or wall do not have suf-
ficient load-bearing capacity, the product may
come loose and fall down. Brine fluid may
leak from damaged lines.
▶
When installing the product, ensure that
the fixing elements and the wall have suffi-
cient load-bearing capacity.
▶
Check the quality of the wall.
1.
Use the minimum wall clearances (
→
Page 13) and the
supplied mounting template to align the product.
2.
Observe the requirements for the installation site
(
→
Page 11).
3.
Install the unit mounting bracket
(1)
on the wall or
mounting frame using the rawl plugs and screws
(2)
provided.
4.
Hang the product
(3)
on the unit mounting bracket from
above using the hanging bracket.