64
Installation and maintenance instructions 0020213394_05
© Heating and Hotwater Industry Council (HHIC)
www.hhic.org.uk
* All installations in England and Wales must be notified to Local Authority Building Control (LABC) either directly or through a
Competent Persons Scheme. A Building Regulations Compliance Certificate will then be issued to the customer.
Issue date: 20.08.2020
ADDITIONAL SYSTEM INFORMATON (Tick the appropriate boxes/Measure and Record)
Water flow rate setting of the heat pump at commissioning (l/min):
Additional heat sources connected:
Gas Boiler
Oil Boiler
Electric Heater
Solar Thermal
Other:
ALL INSTALLATIONS
All electrical work complies with the appropriate Regulations
Yes
The heat pump and associated products have been installed and commissioned in accordance with the manufacturer’s instructions
Yes
The operation of the heat pump and system controls have been demonstrated to and understood by the customer
Yes
The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer
Yes
Commissioning Engineer’s signature:
Customer’s signature
(To confirm satisfactory demonstration and receipt of manufacturers’ literature)