Installation and maintenance instructions ecoTEC 0020029172_03
12
4.5 Required
minimum
gaps/
installation clearances
For the installation/assembly of the boiler as well as for
carrying out future maintenance tasks, you need the
minimum gaps and installation clearances given below:
250
350
Fig. 4.3 Required minimum gaps/installation clearances
It is not necessary to ensure a particular clearance
between the boiler and combustible materials or
components as the temperature of the boiler will always
be less than the maximum permissible temperature of
85 °C at its rated heating output. You need a minimum
of 600 mm clearance in front of the boiler to enable
easy access for servicing. This may be provided by an
openable door.
4.6
Using the installation template
Only use the assembly template provided to mount the
boiler.
• Align the installation template vertically and fix it to
the wall.
• Mark the positions of the drill holes for the hanging
bracket and also the position of the wall opening for
the air/flue gas duct on the wall.
• Remove the assembly template from the wall.
• Drill 2 holes for the hanging bracket in the wall, each
with a diameter of 8 mm.
• If necessary cut the aperture in the wall for the air/
flue gas duct.
4.7 Mounting
the
boiler
a
Caution!
When assembling the boiler make sure that the
fixing point has a sufficient load-bearing
capacity. Also take the condition/nature of the
wall into account.
3
75
175
270
25
44
1
2
Fig. 4.4 Mounting the boiler
• Mount the hanging bracket (
1
) on the wall using the
wall plugs and screws (
2
) provided with the boiler.
• Hang the boiler (
3
) on the hanging bracket from
above using the suspension bracket.
4 Assembly
Summary of Contents for ecoTEC VU 466/4
Page 53: ......
Page 56: ...0020029172_03 GB 062010 Subject to alterations ...