4 Set-up
10
Installation and maintenance instructions ecoTEC pure 0020258016_01
4.7
Wall-mounting the product
1
1.
Check whether the wall has sufficient load-bearing ca-
pacity to bear the operational weight of the product.
2.
Check if the supplied fixing material may be used for
the wall.
Conditions
: The load-bearing capacity of the wall is sufficient, The fixing
material may be used for the wall
▶
Wall-mount the product as described.
▶
Install the hanging bracket
(1)
on the wall.
▶
Hang the product on the product bracket from above
using the suspension bracket.
Conditions
: The load-bearing capacity of the wall is not sufficient
▶
Ensure that wall-mounting apparatus on-site has a suf-
ficient load-bearing capacity. Use individual stands or
primary walling, for example.
▶
Do not wall-mount the product if you cannot provide
wall-mounting apparatus with a sufficient load-bearing
capacity.
Conditions
: The fixing material may not be used for the wall
▶
Wall-mount the product as described using the adapted
fixing material provided on-site.
4.8
Removing the front casing
A
B
B
C
D
▶
Remove the front casing as shown in the illustration.