Installation 4
0020214491_01 ecoTEC plus Installation and maintenance instructions
9
4.4
Product dimensions and connection
dimensions
A
Ø 80/125
R 1
172
172
32
224
224
121
140
75
211
800
61
94
119
Ø 25, R1
G 1 1/2
Rp 1
Rp 1
G 1 1/2
R 3/4
480
472
6
7
5
4
3
9
11
10
8
1
2
1
Flue gas connection,
80/125 diameter
2
Hanging bracket
3
Gas pipe, 25 mm dia-
meter, gas connection
R1“
4
Expansion vessel con-
nection
5
Heating return connec-
tion
6
Heating flow connection
7
Expansion relief valve
connection
8
Condensate discharge
connection
9
Flow drain opening
10
Filling connection option
(combined filling and
emptying valve)
11
Condensate trap's
cartridge
Consult the installation template that is supplied to find the
dimension A.
4.5
Minimum clearances and installation
clearances
A
B
A
500 mm
B
400 mm
▶
When using the accessories, observe the minimum clear-
ances/installation clearances.
4.6
Clearance from combustible components
▶
It is not necessary to maintain a clearance between the
product and components made of combustible materials
that go beyond the minimum clearances.
4.7
Using the installation template
1.
Position the installation template vertically over the in-
stallation site.
2.
Secure the template to the wall.
3.
Mark on the wall all the points required for the installa-
tion.
4.
Remove the installation template from the wall.
5.
Drill all the holes required.
6.
Make any perforations necessary.