24
Installation and maintenance instructions 0020244997_07
7
Installation
7.1
Installation requirements
7.1.1
Information on the gas group
In the as-supplied condition, the product is preset for opera-
tion with the gas group indicated on the data plate.
7.1.2
Purging the liquid gas tank
If the liquid gas tank is not purged properly, this may result in
ignition problems.
▶
Ensure that the liquid gas tank has been purged properly
before installing the product.
▶
If required, contact the filler or the liquid gas supplier.
7.1.3
Using the correct gas type
Using the incorrect gas type may cause fault shutdowns in
the product. Ignition and combustion noise may occur in the
product.
▶
Only use the gas type listed on the data plate.
7.2
Preparing for installation
1.
Make sure that the existing gas meter is capable of
passing the rate of gas supply required.
2.
Consider the maximum heat output given in DHW
mode.
3.
Install a system separator (to be provided on-site) dir-
ectly on the cold water connection for the combi boiler.
4.
Install the following components:
–
Draining cocks at the lowest points in the heating
installation (
→
current version of "BS 2879")
–
A stopcock on the cold water connection
–
A stopcock in the gas pipe
5.
Check that the volumetric capacity of the expansion
vessel is sufficient for the system volume.
Condition
: The volume of the installed expansion vessel is insufficient
▶
Install an additional expansion vessel, connected as
close to the product as possible, in the heating return.
Condition
: External expansion vessel installed and warm start active
▶
Install a non-return valve in the product outlet (heating
flow) or decommission the internal expansion vessel in
order to prevent the warm start function from being in-
creasingly activated due to backflow.
6.
Install the connection pipes such that they are free
from mechanical stress.
7.
If you use non-diffusion-tight plastic pipes in the heat-
ing installation, ensure that no air gets into the heat
generator circuit.
8.
Only solder connectors if the connectors are not yet
screwed to the service valves.
9.
Only bend connection pipes if they have not yet been
connected to the product.
10.
Flush the heating installation thoroughly before in-
stalling the product.
11.
If, during gas leak-tightness tests, you also place the
gas pipes and the gas valve assembly in the product
under pressure, use a max. test pressure of
≤
11 kPa
(110 mbar).
12.
If you cannot limit the test pressure to 11 kPa
(110 mbar), close any gas stopcocks that are installed
upstream of the product before you carry out the gas
leak-tightness test.
13.
If, during gas leak-tightness tests, you have closed the
gas stopcock that is installed upstream of the product,
relieve the gas line pressure before you open this gas
stopcock.
14.
Install a tundish with condensate siphon for the con-
densate discharge and the exhaust pipe on the expan-
sion relief valve. Route drain pipework that is as short
as possible, at a downward gradient away from the tun-
dish.
15.
Insulate bare pipes exposed to environmental influ-
ences to protect them from frost using suitable insula-
tion material.
7.3
Descaling the water
Scale deposition increases as the water temperature in-
creases.
▶
Descale the water as required.
7.4
Installing the gas connection
1.
Install the gas pipe in accordance with the recognised
rules of technology.
2.
In doing so, ensure that the dimensioning of the gas
pipes is sufficient since, otherwise, this may lead to
fault shutdowns of the unit.
3.
Connect the product to the gas pipe as shown in ac-
cordance with the recognised rules of good engineer-
ing practice.
4.
Remove the residues from the gas pipe by blowing
through the gas pipe beforehand.
5.
Purge the gas pipe before start-up.