Contents
2
Contents
1
Introduction .....................................................4
1.1
Notes on the documentation ................................4
1.1.1
Documents also having validity ...........................4
1.1.2
Storage of the documents ....................................4
1.1.3
Safety instructions and symbols .........................4
1.2
Validity of the manual ............................................4
1.3 General
notes
...........................................................4
1.4 Intended
use
.............................................................4
1.5 CE
label
......................................................................5
1.6 Benchmark
................................................................5
1.7 Gas
Council
Number
...............................................5
2
Unit description, data and dimensions ........ 6
2.1 Technical
data
..........................................................6
2.2 Dimensions
............................................................... 7
2.3
Structure and functional elements .....................9
2.4 Identification
plates
................................................9
2.5 Functional
description
.......................................... 10
3 General
requirements
.....................................11
3.1
Preliminary remarks for room sealed
appliances .................................................................11
3.2 Related
documents
.................................................11
3.3
Scope of supply and accessories .......................12
3.4 Installation
location
...............................................12
3.5 Gas
supply
................................................................13
3.6
Flue pipe ...................................................................13
3.6.1 100 mm standard flue duct ..................................13
3.6.2 Optional 125 mm flue pipe .................................. 14
3.7 Flue
termination
.................................................... 14
3.8 Air
supply
................................................................ 15
3.9 Electrical
connection
............................................ 15
3.10 System
requirements
........................................... 16
3.10.1 Water
circulation
system
..................................... 16
3.11.2 Filling and preparation of the heating
system ...................................................................... 16
3.10.3 Pressure relief valve ............................................. 16
3.10.4 Pressure gauge ...................................................... 16
3.10.5 Heating circuit expansion vessel ....................... 16
3.10.7 Shift load storage tank expansion vessel .........17
3.11
Details for the pumps ............................................17
3.11.1 Circulation
pump
....................................................17
3.11.2 Shift load storage tank circulation pump .........17
3.12 System-Bypass
........................................................17
3.13 Venting
......................................................................17
3.14
Condensate siphonic trap ....................................17
4
Sequence of operations during
installation ..................................................... 18
4.1 Transporting
the
appliance
................................. 18
4.2 Required
minimum
gaps/assembly
clearances .............................................................. 20
4.2.1 Selecting the location for the shift load
storage tank and combination boiler .............. 20
4.3
Unpacking the equipment .................................. 20
4.4
Using the installation template ......................... 20
4.5 Flue
exit
....................................................................21
4.6
Installation of the flue gas system .....................21
4.7
Fitting the appliance hanging bracket ..............21
4.8
Mounting the combination boiler ......................22
4.9 Removing
the
front
case
.....................................22
4.10
General instructions concerning the
heating system .......................................................22
4.11 Gas
connection
......................................................23
4.12
Cold water supply and hot water outlet ..........24
4.13
Piping between shift load storage tank and
combination boiler ................................................24
4.14
Flow and return heating connections ..............24
4.15 Condensate
drain
................................................. 25
4.16
Installing the pressure relief discharge
pipework ..................................................................27
4.17
Storage tank pressure relief discharge
pipework ..................................................................27
4.18
Connecting the flue system to the
combination boiler ................................................27
4.19 Electrical
connection
.......................................... 28
4.19.1 General
requirements
......................................... 28
4.19.2 Connecting shift load storage tank ................. 28
4.19.3 Connection to the power supply ...................... 29
4.19.4 Wiring diagrams .................................................... 30
4.20 Control
units
...........................................................33
4.20.1 Vaillant control units and accessories .............33
4.20.2 External electrical controllers ............................33
4.20.3 Details for the connection of an external
timer to the terminal strip ..................................33
4.20.4 Optional plug-in timers by Vaillant ...................33
4.21 Thermostatic
radiator
valves
.............................33
4.22 Frost
prevention
....................................................33
4.23 Heating
pump
........................................................ 34
4.24 Anti-cyclic "Economiser" control system ....... 34
4.25 Automatic pump spin control ............................ 34
5 Commissioning,
Part
I
..................................35
5.1
Preparatory checks of the electrical system . 35
5.2 Gas
supply
.............................................................. 35
5.3 Cold
water
supply
................................................. 35
5.4
Filling the heating system .................................. 35
5.4.1 Checking the filling pressure of the heating
system ..................................................................... 35
5.4.2 Filling device for ecoTEC plus 937 ................... 36
5.4.3 Initial filling of the heating system .................. 36
5.5
Initial flushing of the system ("cold“) ..............37
5.6
Filling the condensate siphon ............................37
5.7
Setting the pump output .....................................37
5.8 Adjusting
the
bypass
............................................37
5.9
Checking the gas supply .................................... 38
5.9.1 Factory
settings
.................................................... 38
5.9.2 Gas inlet working pressure ................................ 38
5.9.3 Checking the gas rate ......................................... 38
5.10
Fitting the front casing ....................................... 39
5.11
Setting the output of the central heating
(range rating) ........................................................ 39
5.12 Gas
conversion
...................................................... 39