4 Set-up
60
Installation and maintenance instructions aroTHERM 0020257297_02
4.8
Ground installation
4.8.1
Creating a foundation
Applicability:
Region with ground frost
800
200
540
200
1400
Ø100
270
300
100
AB
106
2
3
4
1
▶
Dig a hole in the ground. The recommended dimensions
can be found in the figure.
▶
Insert a downpipe
(1)
(diversion of the condensate).
▶
Add a layer of coarse rubble
(3)
(water-permeable, frost-
free foundation). Calculate the depth
(A)
in accordance
with local conditions.
–
Minimum depth: 900 mm
▶
Calculate the height
(B)
in accordance with local condi-
tions.
▶
Create two concrete strip foundations
(4)
. The recom-
mended dimensions can be found in the figure.
▶
Place a gravel bed
(2)
between and beside the strip
foundations (for condensate drainage).
4.8.2
Installing the product
Applicability:
Small rubber feet
▶
Use the small rubber feet from the accessories. Use
the enclosed set-up instructions.
▶
Ensure that the product is aligned exactly horizontally.
Applicability:
Large rubber feet
▶
Use the large rubber feet from the accessories. Use
the enclosed set-up instructions.
▶
Ensure that the product is aligned exactly horizontally.
Applicability:
Raised base for snowy regions
▶
Use the raised base from the accessories. Use the
enclosed set-up instructions.
▶
Ensure that the product is aligned exactly horizontally.
Summary of Contents for aroTHERM Series
Page 207: ...Appendix 0020257297_02 aroTHERM Country specifics 205 Appendix A Commissioning Checklist ...
Page 210: ......
Page 211: ......