Installation and start-up
Installation manual neutralisation device without feed pump 0020134552_00
7
3
Fitting the T piece
If a chimney water drainage is to be connected to the neu-
tralisation device, you must then fit the T piece (
7
).
>
Shorten the infeed hose so that the supplied T piece can
be fitted using 2 hose clamps (
4
).
>
Fit the T piece using the hose clamps (
4
).
Fitting the drain hose
>
Secure the drain hose (
8
) to the side of the unit at the
connection (
2
).
>
Secure the drain hose (
8
) using a hose clamp (
4
).
Neutralisation medium
An initial filling with neutralisation medium is included in
delivery.
3.4 Start-up
After installation, the neutralisation device is ready for
operation.
>
Switch the gas-fired high-efficiency boiler on again.
3.4.1
Handing over to the operator
You must instruct the operator of the unit on the handling
and operating of the neutralisation device.
>
Provide the operator with all relevant instructions and
unit documentation for safe-keeping.
>
Go through the installation manual with the operator and
answer any questions that may arise.
>
Draw special attention to the safety instructions which
the operator must follow.
>
Inform the operator of the necessity to ensure that the
neutralisation device is regularly inspected/maintained
(inspection and maintenance contract).
>
Make the operator aware that the instructions must be
kept close to the neutralisation device.