Contents
2
Installation and maintenance instructions atmoMAG 0020271929_00
Contents
1
Safety .................................................................... 3
1.1
Action-related warnings ......................................... 3
1.2
Intended use .......................................................... 3
1.3
General safety information .................................... 3
1.4
Regulations (directives, laws, standards) .............. 5
2
Notes on the documentation .............................. 6
2.1
Observing other applicable documents ................. 6
2.2
Storing documents................................................. 6
2.3
Validity of the instructions...................................... 6
3
Product description............................................. 6
3.1
Information on the data plate................................. 6
3.2
Product design....................................................... 6
3.3
CE label ................................................................. 7
4
Set-up.................................................................... 7
4.1
Checking the scope of delivery.............................. 7
4.2
Wall pre-installation ............................................... 7
4.3
Minimum clearances.............................................. 8
4.4
Dimensions ............................................................ 9
4.5
Requirements for the installation site .................. 11
4.6
Removing the product casing .............................. 11
4.7
Installing the product casing ................................ 11
4.8
Wall-mounting the product................................... 11
5
Installation.......................................................... 11
5.1
Information on liquid gas operation ..................... 12
5.2
Purging the liquid gas tank .................................. 12
5.3
Using the correct gas type................................... 12
5.4
Integration into a solar system............................. 12
5.5
Sequence for installing the connection................ 12
5.6
Connecting the flue pipe...................................... 13
6
Start-up ............................................................... 13
6.1
Carrying out the initial start-up............................. 13
6.2
Checking and, if required, setting the water
flow rate ............................................................... 13
6.3
Gas conversion.................................................... 13
6.4
Checking that the flue gas sensor works
correctly ............................................................... 13
6.5
Checking the gas flow pressure .......................... 14
6.6
Checking leak-tightness ...................................... 15
6.7
Handing the product over to the operator............ 15
7
Troubleshooting ................................................ 15
7.1
Detecting and eliminating faults........................... 15
7.2
Eliminating faults in the product........................... 15
8
Inspection and maintenance ............................ 15
8.1
Procuring spare parts .......................................... 15
8.2
Draining the product ............................................ 16
8.3
Removing the burner ........................................... 16
8.4
Cleaning the burner ............................................. 17
8.5
Cleaning the injector rail ...................................... 17
8.6
Removing the down-draught diverter .................. 17
8.7
Cleaning the down-draught diverter .................... 17
8.8
Removing the heat exchanger............................. 18
8.9
Cleaning the heat exchanger............................... 18
8.10
Repairing any damage to the coating of the
heat exchanger .................................................... 18
8.11
Checking the water valve .................................... 18
8.12
Checking the heat input....................................... 19
8.13
Setting the maximum heat input .......................... 20
8.14
Checking the heat input....................................... 20
8.15
Completing inspection and maintenance work .... 21
8.16
Checking the product for leak-tightness .............. 21
9
Decommissioning.............................................. 21
10
Recycling and disposal..................................... 21
11
Customer service............................................... 21
Appendix ............................................................................ 22
A
Commissioning checklist ................................. 22
B
Troubleshooting ................................................ 22
C
Tables of gas settings ....................................... 23
D
Tables of gas settings ....................................... 23
E
Type G wiring diagram ...................................... 25
F
Inspection and maintenance interval .............. 26
G
Technical data.................................................... 26
Index ................................................................................... 33