background image

 

 

To  install  the  limit  switch  on  the  visual  position 
indicator assembly: 

  Attach the limit switch mounting bracket 

(29)  to  the  channel  bracket  (25)  using 
the limit switch bracket mounting screws 
(30).   

  Mount  the  limit  switch  (28)  on  the 

bracket  using  the  limit  switch  mounting 
screws  (31)  so  that  the  switch

whisker

  is  on  the  left  side  of  the  flag 

(23) when looking at the flag. 

 
Typically,  the  limit  switch  contacts  close  when 
the valve is closed.  Adjust the switch position so 
that  the  indicator  flag  (23)  actuates  the  switch 
when  the  valve  is  fully  closed.    DO  NOT 
ADJUST THE FLAG POSITION.   
   

 

 

Figure 3 

 

Item 

Description 

Material 

19 

Lower Bushing 

Brass 

20 

Roller 

Stainless Steel 

21 

Roller O-Ring 

Buna-N Rubber 

22 

Retaining Ring 

Stainless Steel 

23 

Indicator Flag 

Stainless Steel 

24 

Indicator Flag Screw & Washer 

Stainless Steel 

25 

Channel Bracket 

Aluminum 

26 

Upper Bushing w/Flush Port 

Stainless Steel 

27 

Upper Bushing O-Ring 

Buna-N Rubber 

28 

SPDT Limit Switch 

See Switch for 
Model Number 

29 

Switch Mounting Bracket 

Aluminum 

30 

Bracket Mounting Screw & Nut 

Stainless Steel 

31 

Switch Mounting Screw  

Stainless Steel 

 
 
BACKFLOW ACTUATOR OPERATION 

The  actuator  is  not  designed  to  open  the  valve 
with  pressure  at  its  outlet.  Therefore,  prior  to 
using  the  actuator,  close  the  pump  isolation 

valve  and  relieve  line  pressure  between  the 
check  valve  and  isolation  valve.    To  open  the 
valve, loosen the jam nut (15) turn the T-handle 
clockwise.    The  handle  should  turn  easily.  
When resistance is felt, the disc has reached its 
body stop and is in the fully open position.  Then 
open  the  isolating  valve  to  allow  backflow 
through the valve.  
 

WARNING 

Relieve line pressure before using back flow 

actuator or damage may occur.  

 
Upon  completion  of  the  backflushing  operation, 
turn the T-handle fully counterclockwise to allow 
the  valve  disc  to  return  to  the  closed  position. 
Lock the backflow actuator in the closed position 
with the jam nut (15). The system is again ready 
for normal operation. 

 
BACKFLOW ACTUATOR FIELD 
INSTALLATION 

  Isolate  the  rubber  flapper  check  valve, 

depressurize and drain pipeline. 

 

WARNING 

Removal of the bottom plug while under 

pressure may cause bodily harm. 

 

 

  Remove  the  pipe  plug  in  the  bottom 

boss of the valve. 

  Inspect  the  backflow  rod  (16)  and 

ensure  the  T-handle  has  been  turned 
fully  counterclockwise.  The  rod  should 
extend 

about  1”  past  the  end  of  the 

brass backflow tube (14).  Apply thread 
sealant to brass threads. 

  Insert the threaded end of the assembly 

into  the  valve  boss.  Slowly  turn  the 
assembly  into  the  boss.    Continue 
turning the assembly into the valve for a 
tight fit.   

  Introduce pressure and check for leaks.  

Tighten if needed.  

 
  

Reviews: