background image

6

7

Installation

Operation

Cold

Hot

Hot tap

 - moving the tap lever to the left will increase the flow of water. 

Cold tap

 - moving the tap lever to the right will increase the flow of water. 

Before installing your new mixer,  flush through the pipe work to ensure removal of 

debris, turn off the water supply.
Make sure that the seals are in position in the bottom of the mixer body.
Position the mixer on the bath. From the underside of the bath fit the rubber 

washers and nuts. Tighten the nuts to clamp the mixer to the bath. 

CAUTION:

 Do not over tighten the nuts as this may damage the bath. 

Connect the water supply to the inlet pipes. The hot water should be connected to 

the left hand pipe.

Cold 

control 

handle

Hot 

control 

handle

Rubber 

washer

Seal

Nut

Rubber 

washer
Nut

Seal

Reviews: