1
vacon • 2
BASICS
Tel. +358 (0) 201 2121 • Fax +358 (0)201 212 285
1.
BASICS
The basic idea is always to achieve energy and/or power management of
Common Point of Coupling
.
Typical use cases are
•
time shift for production
•
peak load shaving for distribution
•
smoothen load for average energy
•
backup power or black out start
•
grid support
Figure 1. Power balancing
Energy Production
kW
Average Power
t
Charging
Discharging
Process Power
Grid Power
kW
Average Power
t
Charging
Discharging
Summary of Contents for NX6
Page 1: ...vacon nx ac drives design guide hybridization ...
Page 2: ......