![V-TUF RAPID-VSC User'S Operating Manual Download Page 11](http://html1.mh-extra.com/html/v-tuf/rapid-vsc/rapid-vsc_users-operating-manual_3086833011.webp)
12
INSTALLATION
Attach the lance to the high pressure hose (1) and the other end to the output connection (2). Fit the
sheath (B) in order to protect the hydraulic connection and to avoid the risk of scalding by contact. The high
pressure pump is supplied already full of lubricating oil. Attach a water tube (not supplied) to the entry
connection (3) and the other end to the tap of the water source (4) which must be able to provide a
minimum flow rate equal to that of the pump.
Check that the electric supply socket has the appropriate characteristics and differential protection, and
conforms to safety standards in force, then insert the plug into the power socket.
Wherever possible, avoid the use of extension cables with the electrical supply cable.
ATTENTION
The electrical power supply should be provided by a magneto thermic switch adequate to the power of the
machine.
Also, there should always be installed a high sensitivity differential switch with a cut-off threshold of
Idn=0.030 A.
It is necessary that the machine is earthed in such a way as to guarantee a contact voltage of no more than
25V.
Operation of the machine should be carried out in such a way that damage cannot be caused to people or
property and, wherever possible, away from paths of transit.
Summary of Contents for RAPID-VSC
Page 22: ...23 ELECTRIC DIAGRAM SINGLE PHASE 230V...
Page 23: ...24 ELECTRIC DIAGRAM THREE PHASE 230V...
Page 28: ...BOILER PARTS DIAGRAM...
Page 31: ...ELECTRIC BOX PARTS DIAGRAM Item 2...
Page 34: ...XHDM141PUMP PARTS DIAGRAM...