D291308.7M.fm
Main Screen Details
Chapter 3: Operation
31
If
Auto Tensioning
is configured in the
Supervisor Settings
screen, the graph will appear as
below while auto tensioning is in progress. Once Auto Tensioning is complete, the PT-55 will
automatically begin the pull test.
During and after a peel test, the
Peel Test Graph
displays the test results. The test below shows
a test with
Moving Average Disabled
in the
Supervisor Screen
. All readings are between the
Upper
and
Lower Limit
values, a
PASS
result.