Study this manual carefully before any installation of the batteries.
The batteries must only be installed and operated by trained personnel.
Check the quantity of battery and accessories with delivery list.
Check the appearance whether there is damaged or leakage, if any damage is
detected, please do not proceed to the next installation.
6 Installation
6.2 Unpacking and Inspection
Make sure to disconnect and isolate the battery from any electrical source,
and then turn on the MCB (switch). Verify that the red ALM LED does not stay on for
more than 30 seconds.
Turn off the switch and continue with the installation.
6.3 Preparing for Installation
Figure 6-1 Make Sure the Battery is in Off Status
1 Make sure the battery is in off status. As shown in Figure 6-1.
6.4 Installation