Chapter 6 Commissioning
6.1 Commissioning notes
1. Before commissioning works, please take off the wires, and use the Multimeter to test the resistance value
of cables at first. The resistance of all wires should be over 4.7 k
Ω
.
2. If connected more than one Start/Abort Button, the end resistor must be installed on the last Start/Abort
Button.
3. If the extinguishing panel was connected with Aerosol products or Electrical-explosion initiator, please set
the Jumper P4 and P5 same as the Pic 6-1 shown.
Pic 6-1
4. In some projects with special requirements, if the function of loop testing for short or open circuit is not
required, please turn the switch to the right side as Pic 6-2 shown.