SCUBAPRO S600-S550 SECOND STAGES
2003 SCUBAPRO
Important note
: The following information is not designed to be a complete training guide for servicing the listed SCUBAPRO regulators. All SCUBAPRO
technicians are required to attend an annual service training program to insure safe handling and servicing of SCUBAPRO products. All SCUBAPRO technicians
must be employed by an authorized SCUBAPRO facility.
9
P/N
43
04
00
00
TOOLS
NEEDED
No tools needed
this step
Remove the adjustable orifice. Take
off the adjustable orifice o’ring, as it will
be replaced. Remove the air barrel
o’ring for inspection.
A wooden dowel or “chopstick” may be
helpful in removing the orifice.
This Step Is Only Performed As Needed
When it is necessary to remove the
VIVA flow vane, use the flow vane
removal tool (p/n 43.300.225).
This step is seldom needed, unless the
VIVA flow vane o’ring is worn or
damaged.
Top view
P/N
43
04
00
00
TOOLS
NEEDED
No tools needed
this step
This Step Is Only Performed As Needed
If the VIVA flow vane is removed, it may be
necessary to replace the entire VIVA
assembly, including the o’ring.