![USC LPV Operator'S Manual Download Page 27](http://html.mh-extra.com/html/usc/lpv/lpv_operators-manual_1064061027.webp)
Page 27
PORTABLE LPV TREATER
PREPARING TREATER FOR TRANSPORT
1. Run the system untill all of the seed is out of the treater and the outlet conveyor.
2. Go to the main control panel HMI treater main screen. Press the HOA button.
Press and hold the UP button on the drum actuator module and raise the drum
until the inide drum frame is level with or above the outside treater frame.
3. Use the right control lever to rotate the outlet conveyor in until it reaches the dead
stop and is now parallel with the trailer.
4. Use the left control lever to lower the outlet conveyor until it is resting inside of the
cradle.
5. Turn off the hydraulic motor.
6. Secure the outlet conveyor by following step three of the treater set up procedure
on page 25 in reverse.
7. Go to the main control panel HMI treater main screen. Press and hold the DOWN
button on the drum actuator module and lower the drum until it stops, then insert
the clevis pin back in the drum transport bracket.
8. Turn off the pump stand motors that are still running.
9. Turn off the power to the treater and Main Control Panels.
10. After all systems have been turned off, shutdown the generator by placing the main
disconnect switch in the OFF position. Then press the red button once to shutdown
the generator.