![USC LPV Operator'S Manual Download Page 25](http://html.mh-extra.com/html/usc/lpv/lpv_operators-manual_1064061025.webp)
Page 25
PORTABLE LPV TREATER
TREATER SET UP
9. Now that the generator is up and running, Turn on the power to the treater, treater
I / O and Main Control Panels.
10. Use the following steps to deploy the discharge conveyor.
STEP 1:
Remove the hitch pin from the treater drum
transport bracket located next to the drum actuator.
Hitch
Pin
STEP 2:
Go to the main control panel HMI treater
main screen. Press the HOA button. Press and hold
the UP button on the drum actuator module and raise
the drum until the inside drum frame is level with or
above the outside treater frame.
STEP 3:
Remove the hitch pin from the outlet conveyor lockdown handle (bottom, left).
Hold the latch rod in one hand and lift the handle with the other hand until the latch
crossbar clears the conveyor lock on the conveyor head. Allow the latch rod to rest
at the bottom of the slot on the supprt plate (bottom, right). The conveyor is now ready
to move to a working position.
Hitch
Pin