7
System Preparation
2.
Install the 1” x 1/2” reducing bushing in the “IN” port of the filter head.
BE SURE
to
use Teflon tape on the threads. Make sure the fitting tightens in the head. If the fitting
bottoms out, remove it and put more tape on the bushing. It should snug up before it
bottoms in the port.
3.
Install the 1” x 1/2” reducing bushing in the “OUT” port of the filter head.
BE SURE
to
use Teflon tape on the threads. Make sure the fitting tightens in the head. If the fitting
bottoms out, remove it and put more tape on the bushing. It should snug up before it
bottoms in the port.
4.
Install the 1/2” MPT x 3/8” QC fitting into the previously installed bushings on the inlet
and outlet.