___________________________________________________________________
United Renewable Energy Co., Ltd.
Page 13 of 45
Installation
This Manual introduces the basic steps how to install and set up URE MA1-INV.
NOTE: please pay attention for unpacking the battery, the worst case is that
some components could be damaged.
Observe the specified minimum distances to neighboring objects.
The minimum distances ensure that:
•
There is sufficient heat dissipation,
•
The storage system door can be opened easily,
•
There is sufficient space for carrying out maintenance work.
2.1
Installation Site and Environment
The following sites are not allowed for installation:
•
Sites where the freezing point is reached.
•
Sites with humidity and condensation over 85%.
•
Sites which are salty and where humid air can penetrate.
•
Flooded areas.
•
Earthquake areas
–additional security measures are required here.
•
Sites that are higher than 2000 meters above the sea level.
•
Sites with explosive atmosphere.
•
Sites with direct sunlight.
•
Sites with extreme change of ambient temperature.
•
Wet rooms.
•
Sites with highly flammable materials or gases.
•
Sites with a potentially explosive atmosphere.
•
Installation wall load must be more than 180 kg
2.2
Installation