Step 20:
Open battery housing case and remove DIP baffle, set the DIP switch
2 to “on” mode at the bottom of the module. Then close the DIP baffle and
battery housing case.
NOTE: only the farthest battery from inverter need to set DIP.
If you want to add more batteries, please install the extra ones by the side as
shown below.
Figure 29 Increase the Battery Modules
NOTE: when adding on battery modules, please install only by side.