![URE MA1-INV Installation Manual Download Page 29](http://html.mh-extra.com/html/ure/ma1-inv/ma1-inv_installation-manual_1062066029.webp)
___________________________________________________________________
United Renewable Energy Co., Ltd.
Page 28 of 45
NOTE: Meter 7, 8 connect the RJ45 3, 6, then RJ45 connect the cable box/super
cable box.
ADL-3000 three-phase connect (without CT, with meter plug), if applicable:
Figure 35 ADL-3000 three-phase Connect (without CT, with Meter plug)
ADL-3000 three-phase connect (with CT, without meter plug), if applicable:
Figure 36 ADL-3000 three-phase Connect (with CT, without Meter plug)
NOTE: Meter 7, 8 connect the RJ45 3, 6, then RJ45 connect the cable box/super
cable box.