© Urban Coop Company, all rights reserved.
6
Install C1 Into Coop
(Prior to putting on roof)
Fig 1
Lower C1 egg box front assembly into roost tight against front edge of C2 bottom assembly. Make bottom
edge of C1 assembly flush with bottom edge of C2 assembly.
Figs 2 and 3
Top of C1 egg box front assembly will stick up a little, and this is okay. Using E1 brown screws
and pre-drilled holes, affix C1 egg box front assembly by screwing through holes on outer rails of B1 roost side
driving screws into sides of C1.
Fig 1
Fig 2
Fig 3
Top Screw
Bottom Screw
C1
Sticks up OK
7
© Urban Coop Company, all rights reserved.
Roost Bars Install
Fig 1
Lower B4 roost bars (longer) down through the roost top. Using one E1 brown screw on each end, screw
through bottom rail of B1 roost side panels into center ends of B4 roost bars. If you miss the exact center of the
bar, no big deal, but try to get it the best you can in the center.
Roost Bar
Brown Screws