© Urban Coop Company, all rights reserved.
Fig 1
Fig 2
4
Assemble Egg Box Parts
FIG 1
Using provided E2 green screws, attach two C2 egg box sides to C2 egg box bottom (wire side down) with
three screws per side in pre-drilled holes. Bottom is square, so there is no right or wrong orientation other than
wire side down, and sides are interchangeable, too.
FIG 2
Using two E2 green screws, attach C3 egg box entry/exit board to C1 egg box front from behind inserting
screws in pre-drilled holes. Orient as shown.
C3
C1
C2 Side
C2 Bottom
© Urban Coop Company, all rights reserved.
5
Install C2 Into Coop
(Prior to putting on roof)
Fig 1
Lower bottom of C2 assembly into door end of roost.
Fig 2
Drop C2 assembly down to where the top edge is flush with lower rail of B1 roost side and back edge tight
against B2 roost front wall.
Fig 3
C2 bottom forms the door stop as shown and allows for collection of eggs once roof is put on. Attach from
inside using four E4 gold screws into pre-drilled holes.
Fig 1
Fig 2
Fig 3
Top Edge of C2
Flush on Inside
With This Rail
4” Opening
Door Closes
Against C2
Bottom.