12 508159-000
TL49K
1.
Ensure that the booms are fully lowered, all outriggers are fully raised
and the machine is in a menoeverable condition.
2.
Engage the the friction drive cylinders against the trailer tyres by pulling
actuating levers forward and down until they lock overcentre.
3
.
Ensure the power selector switch is set to Base.
4
.
Disengage the handbrake, and ensure that the Jockey wheel directional
locking pin is removed
5.
Traction is controlled via the 2 hydraulic levers on the R/H side of the
chassis.
6.
The left lever controls the left motor and the right lever the right.
Operating only the left lever forward will turn the machine right and the
right lever will turn the machine left, operate both levers together for
parallel
drive.
7.
When the machine is in position replace handbrake.
HAND MANOEUVERING (Optional)
Ensure friction drive cylinders are disengaged prior to platform
operation or towing.
!
Summary of Contents for TL49K
Page 2: ......
Page 4: ......
Page 10: ...6 508159 000 TL49K OPERATING ENVELOPE Height and Distance in Metres 200kg...
Page 38: ......
Page 40: ......
Page 46: ...6 508159 000 TL49K ARBEITSBEREICH Abmessungen in Metern 200kg...
Page 74: ......
Page 76: ......
Page 110: ......
Page 112: ......
Page 146: ......
Page 149: ......
Page 154: ...6 508159 000 TL49K SPAZIO DI LAVORO Altezza e distanza in metri 200kg...
Page 182: ......
Page 183: ......