Área Industrial La Dehesa
Calle Dehesa Vieja, 2
28052 Madrid (España)
Tel. (+34) 918 021 649
Fax. (+34) 917 750 542
[email protected]
13
4. Installation
4.1 Package Items
Unpacking and check the Packing List
1) For battery module package:
Two power cables and one communication cable for each battery package:
Grounding cable:
Grounding cables use 10AWG yellow-green cables.
UE-24Li2900WH modules’ grounding is based on metal directly touch between the module’s surface (SGCC)
and rack’s surface. If uses normal rack, may need to remove the paint at the corresponding place.
Or install a grounding cable to the grounding point of the modules.
ecoline
www.masterbattery.es/en
UE-24Li2900WH
180
180
210
1000