Operating manual
RS100-4-S
BA-AB-4485-RS100-Englisch.doc
Erstelldatum 30.05.2011 14:57:00
25
Attention:
These tasks may only be carried out by an officially certified electrician!
Attention:
These tasks may only be carried out by an officially certified electrician!
8.4 Control electrical connection (clockwise rotation field)
Before commissioning of the shredder, it has to be controlled with a clockwise rotating field
indicator, if the machine is connected in a right-handed rotary field. You can find further informations
therefore in the appendix.
8.5 Control climate control unit
Before commissioning of the shredder, it has to be controlled, if climate control unit in the control
box is working correct. If the control lamp at the side wall of the control box glows green, the correct
operation of the climate control unit is given.
8.6 Shaft ventilation system
•
The shredder is equipped with a shaft ventilation system.
•
The shaft ventilation system must be connected to an adequate air supply. The customer has to
supply a pneumatic hose 8mm with filtered compressed air, unlubricated grade of filtration
40Bm. Air quality class 5:4:3 to DIN ISO 573-1, pressure 1 bar, volume max. 1000l/h