23
Purging the system
Before preparing the first coffee or if the appliance has not
1.
been used for an extended time, inner tubes have to be purged
and filled again with water.
Open the lateral cover and check if the brewer assembly and
2.
the coffee grounds container have been inserted correctly.
Otherwise purging will not be possible. First insert the brewer
into the appliance until it latches into place, then insert the
coffee grounds container.
Close the lateral cover. (The lateral cover is fitted with a
3.
safety switch. The fully automatic coffee machine can only
be switched on when the lateral cover has been closed
correctly.)
Keep the
4.
MeNÜ
/MENU button pressed and switch the
appliance on, using the
eIN/aUs
[ON/OFF] switch on the rear
of the appliance. Release the
MeNÜ
/MENU button.
Turn the steam nozzle towards the drip tray or into a jug with
5.
a minimum capacity of 300 ml.
Turn the steam control on the right side of the appliance to
6.
eIN
[ON].
Press the
7.
MeNÜ
/MENU button and keep it pressed until at
least 50 ml of water have been discharged. Release the
MeNÜ
/
MENU button, turn the steam control to
aUs
[OFF] and switch
the appliance off, using the
eIN/aUs
[ON/OFF] switch.
oPeration
QuicK guiDe: the first cuP of coffee
Fill the water tank.
1.
Fill the coffee beans container.
2.
Connect the appliance to the mains.
3.
Check if the brewer assembly and the coffee grounds container
4.
are inserted correctly.
Check if the main switch on the rear of the appliance is
5.
switched to
aUs
[OFF].
Press the menu button and keep it pressed, switch the main
6.
switch on the rear of the appliance to
eIN
/ON, release the
menu button, turn the steam control on.
Place a jug (minimum capacity 300 ml) under the steam
7.
nozzle.
Press the menu button and keep it pressed until at least 50 ml
8.
have been discharged.
Turn the steam control off and switch the appliance off using
9.
the main switch.
Switch the appliance on using the main switch.
10.
The display indicates „Standby“.
11.
Press the Start button. The appliance starts the heating
12.
process.
Place a cup under the coffee outlet.
13.
During the heating phase an automatic cleaning programme
14.
will be executed.
If the display indicates „
15.
Betriebsbereit/
Ready“ you may obtain
your first coffee.
In the first grinding process, „
16.
Bohnen nachfüllen
/Refill beans“
may be indicated, although the beans container is full. In this
case please press the corresponding coffee button again.
If necessary, purge the appliance.
1.
Make sure that the drip tray and grid are correctly inserted.
2.
Close the lateral cover. The lateral cover is fitted with a safety
3.
switch. The automatic coffee machine can only be switched on
when the lateral cover has been closed correctly. If the cover
is opened during operation, the appliance is automatically
switched off.
Before switching the appliance on, please turn the steam
4.
control on the right side of the automatic coffee machine to
aUs
[OFF].
Switch the appliance on, using the
5.
eIN/aUs
[ON/OFF] switch
on the rear of the appliance. The display indicates:
STANDBy
Place a cup under the outlet.
6.
Press the Start button. you will hear an operation noise. The
7.
automatic coffee machine is starting its self-test. The display
indicates the following message:
FUNKTIONSTEST
LäUFT
This means that the status of the corresponding component of
8.
the automatic coffee machine is tested and the user executes
the corresponding operating step as required.
The following messages may be displayed during testing:
9.
BRÜHGRUPPE
EINSETZEN
The brewer assembly is not
inserted or not inserted pro-
perly.
WASSERTANK
FÜLLEN
The water tank is empty and
must be refilled.
SATZBEHäLTER
EINSETZEN
The coffee ground container is
not inserted properly.
DAMPFREGLER
ZUDREHEN
The steam controller is turned
to EIN [ON] and has o be tur-
ned off.
The message
10.
FUNKTIONSTEST
LäUFT
is displayed for a few seconds.
After the testing is concluded, the following message is
11.
displayed:
AUFWäRMEN
This means that the automatic coffee machine is in the
12.
heating phase for approx. 2 to 3 minutes. At the same time,
an automatic cleaning of about 20 seconds is carried out.
During this process, hot water leaks from the machine, as
the inner brewing pipe, the brewer assembly and the outlet
nozzle are rinsed. This mechanism serves hygienic purposes
and improves the quality of the coffee.
Usually the following message is displayed after a few
13.
seconds:
BETRIEBSBEREIT
The automatic coffee machine is now ready for operation and
14.
you may brew your coffee.
Further proceeding is described in the chapter „Settings for
15.
the preparation of coffee“.
Summary of Contents for 28811
Page 6: ...6 Einzelteile 1 2 3 4 6 7 8 9 10 11 12 5 15 14 13 16 ...
Page 95: ...95 Notizen ...
Page 100: ...Aus dem Hause ...