General Information
Inspection Of Equipment
Upon receipt of the unit, inspect for visible or concealed
damage. Report any damage to the carrier, and file a
damage claim�
Handling
To facilitate handling, the unit is set on a wooden skid so that
it may be picked up with a two-wheel hand truck or fork lift�
Under no circumstances should the unit be “walked” on the
corners of the skid� Use dolly trucks or pipe rollers to move
the unit to its proper location�
Location
Unit can be installed either as a complete package or split
into two sections. It can be either floor mounted or ceiling
mounted�
Before unit is installed, a thorough study should be made of
the structure� Careful consideration must be given to location
of wiring, condensate disposal, ductwork and accessibility
to the unit for maintenance and servicing� It is necessary
that a minimum clearance space be allowed on each side
of the unit to accommodate maintenance and servicing�
This minimum clearance must be 36" for all units. Attention
must also be given to floor, ceiling or wall load limitations
(See Figure 2)� Location should also provide for condensate
removal, trapping and disposal�
Discharge Air from condenser coil should be deflected
away from supply air to condenser, to prevent
recirculation� See also “Condensing Section Outdoor
Modification Kit” on page 27.
CAUTION
Unit should not be located in space subject
to freezing temperatures�
Mounting And Setting In Place
Units can be shipped as an integral package with a tie rail
attached to both sides of the unit at each of the four mounting
channels�
If unit is not to be split but is to be hung,
do not
remove
tie rail. Use field supplied (3/8" minimum diameter) hanging
rods, with proper washers and locknuts, then elevate unit to
the exact location where it is to be installed� Fasten the rods
securely to the supporting structure. Install field supplied
vibration isolation as required� Level unit�
If unit is to be floor mounted and not separated,
do not
remove tie rails� Locate on a level pad and secure as
necessary� Field supplied unit isolation can be installed as
required�