Page 14
OPERATING INSTRUCTIONS
Roll Change Out
When installing new rolls, care should be taken to ensure that the vertical coating
roll springs are firmly positioned on the screw shoulder and screw thrust bearing.
This adjustment is done by the hex nut on the lower end of the elevating screw.
Minimum tension prevents damage to the rolls should a varied substrate
thickness be passed through.
ROLL MOUNTINGS
All rolls are mounted in self-aligning ball bearings. Self-aligning seals
effectively keep grease in and prevent entry of dirt regardless of alignment. All
bearings are mounted on smooth surfaces to ensure proper mounting and
alignment.