![Union Instruments Pury250 S Operating Instructions Manual Download Page 25](http://html.mh-extra.com/html/union-instruments/pury250-s/pury250-s_operating-instructions-manual_843042025.webp)
25
Transport, installation, and acceptance
6.4.3 Condensate line
NOTE
•
Route hose to avoid kinks, blockages and in a downward sloping manner.
•
Install output condensate in a frost-proof manner!
•
Discharge condensate without any back pressure!
•
A ventilated container is recommended – inspect/clean regularly.
Installation of condensate line
Compression fittings 6mm or ¼” are intended for the connection.
WARNING
Discharge of condensate!
Connection by qualified personnel only!
Observe the installation instructions of the compression fittings, installation by
trained personnel only!
Inspect and if necessary, assemble the hose and compression fittings.
Fig. 6.4:
Hose with clamping ring
Summary of Contents for Pury250 S
Page 1: ...Operating Instructions Gas Cooler Pury250 S ...
Page 5: ...1 Technical data 1 1 Dimensions Weight approx 12 6 kg 28lbs 5 ...
Page 10: ...10 EC Declaration of Conformity ...
Page 15: ...15 4 Protective equipment 4 1 Enclosure cover Fig 4 1 Enclosure cover ...
Page 32: ...32 Transport installation and acceptance ...
Page 34: ...34 Commissioning Switching on ...
Page 36: ...36 Description of the HMI and operator control elements ...
Page 49: ...49 Maintenance ...
Page 53: ...53 ...
Page 54: ...54 ...
Page 58: ...58 Service ...
Page 59: ...59 14 Related documents Declaration of Conformity Service documentation optional ...
Page 60: ...60 Related documents ...
Page 62: ...62 Disposal ...
Page 64: ...64 Spare parts ...