
Manual CWD 2005
Important Information
___________________________________________________________________
Manual CWD2005.doc
9
1.
Important Information
Thank you for specifying a Union CWD 2005 Heating Value Analyzer for your online
process measurement application.
Please read this manual and follow all directions before installation and use of this
gas analyzer.
Unpacking and initial inspection of this unit requires only normal precautions and
procedures applicable to the handling of analytical equipment. All shipping containers
should be carefully checked for any included accessories. Check the shipment
against the packing slip and any system arrangement drawings to ascertain that the
shipment is complete.
The analyzer was carefully inspected and calibrated at the factory. Check the
shipment for possible damage incurred during transit. If there is any sign of visible
damage to the crate or hidden damage inside the shipment, notify the carrier and the
factory immediately as the equipment warranty does not cover damage in shipping.
In the event of trouble during start-up, please contact a factory representative and
inform them of the model and serial number of the unit, plus a fully description of the
problem. Note: The factory will not be responsible if the customer should attempt
repair of the unit during the warranty period without first following any detailed factory
instruction.
All possible care has been taken in the publication of this user manual but Union, its
agents and distributors, accept no liability for any inaccuracies or omissions that may
be found. This manual reflects the state of the product at the issue date below but
further refinements may mean that the manual does not fully reflect your particular
system.
Union Apparatebau reserves the right to make change without notice both to this
publication and the product that it describes.