EV CHECK
27
7.
Operation Elements and Connectors
1-
CP Error “E” Button
2-
PE Error (Earth Fault) Button
3-
PE Pre-Test Touch Probe
4-
PE Pre-Test Warning Indicator
5-
PP (Proximity Pilot) State Rotary Switch Selector (NC,13A,20A,32A and 63A)
6-Mains socket, use for test purpose only, Max allowed current=10A.
7-
Measuring Terminal PE
8-
Measuring Terminal L1,L2,L3
9-
Phase Indicators of L1,L2,L3 Terminals
10-Measuring Terminal N
11-
CP (Control Pilot) State Rotary Switch Selector (A,B,C,D)
12-
Test cable for EV charging station Type 2 with socket outlet or fixed cable with vehicle connector
12
7
Max.250V~/430V 3~50/60Hz
Max.10A Load CAT II 300V
1
CP Error “E”
2
PE Error
PE
PE Pre-Test
4
5
PE
N
L1
L2
9
L3
10
PP State
CP State
11
6
3
8
Summary of Contents for EV CHECK
Page 1: ...EV CHECK Test delle colonnine di ricarica per veicoli elettrici Manuale Utente...
Page 36: ...Lisez ce manuel avant d allumer l unit Informations importantes sur la s curit l int rieur...
Page 54: ...EV CHECK Tests der Lades ulen f r Elektrofahrzeuge Benutzerhandbuch...
Page 72: ...Rev 200817...