PART II: INSTALLATION
15
GAS TRAIN CONNECTIONS
The diagrams show the components of the gas trai included in the delivery and which must be fitted by the installer.The diagrams are in
compliance with the current laws.
Key
WARNING: BEFORE EXECUTING THE CONNECTIONS TO THE GAS PIPE NETWORK, BE SURE THAT THE
MANUAL CUTOFF VALVES ARE CLOSED.
Gas train with valves group MB-DLE (2 gas pressure governor)
Gas train with valves group VGD with built-in gas pressure governor
1
Filter 6
Butterfly
valve
2
Pressure switch - PGMIN
8
Main burner
3
Safety valve with built in gas governor 9
Manual
valve(*optional)
5
Pressure switch - PGMAX (*optional)
10
Bellows unit(*optional)
GAS INLET
BY BURNER CONSTRUCTOR
BY OTHERS
GAS INLET
SUPPLIED BY BURNER
CONSTRUCTOR
BY OTHERS
Summary of Contents for RX63
Page 41: ......
Page 42: ......
Page 43: ......
Page 45: ...Service manual AZL2x LMV2x 3x Burner Management System M12916CD Rev 3 3 01 2017...
Page 52: ...8 Parameters level heating engineer...
Page 94: ...50 ERROR CODE TABLE...
Page 95: ...51...
Page 96: ...52...
Page 97: ...53...
Page 98: ...54...
Page 99: ...55...
Page 100: ...56...
Page 101: ...57...
Page 102: ...58...
Page 103: ...59...
Page 104: ...60...
Page 105: ...61...
Page 106: ...62...
Page 107: ...63...
Page 108: ...64...
Page 113: ......
Page 114: ......
Page 115: ......
Page 117: ...IG FU B...
Page 118: ......
Page 119: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 127: ......