C.I.B. UNIGAS - M039207CB
16
Pressure adjusting range
The pressure adjusting range, upstream the gas valves group, changes according to the spring provided with the valve group.
Keys
1 spring
2 cap
DUNGS MBC valves:
Siemens VGD valves with SKP actuator:
Once the train is installed, connect electrically all its elements: gas valves group, pressure switches, gas proving system.
DUNGS MBC..SE
Siemens SKP actuator
Performance range (mbar)
4 - 20
20 - 40
40 - 80
80 - 150
Spring colour
-
ed
black
green
Performance range (mbar)
0 - 22
15 - 120
100 - 250
Spring colour
neutral
yellow
red
ATTENTION:
once the gas train is mounted according to the diagram on Fig. 6, the gas proving test mus be performed,
according to the procedure set by the laws in force.
1
2
2
1
Summary of Contents for KTP1030
Page 25: ...C I B UNIGAS M039207CB 25 Fig 17 Hydraulic diagram 3ID0014 Two or more burners configuration...
Page 46: ...C I B UNIGAS M039207CB 46...
Page 47: ...C I B UNIGAS M039207CB 47...
Page 48: ...C I B UNIGAS M039207CB 48...
Page 49: ...C I B UNIGAS M039207CB 49...
Page 50: ...C I B UNIGAS M039207CB 50 Pumping Unit Electric Wiring Diagrams...
Page 51: ...C I B UNIGAS M039207CB 51...
Page 52: ...C I B UNIGAS M039207CB 52...
Page 55: ...C I B UNIGAS M039207CB 55...
Page 59: ......
Page 74: ......
Page 83: ......
Page 84: ......
Page 85: ...RWF50 2x RWF50 3x User manual M12922CB Rel 1 0 07 2012...
Page 100: ...16 Note Specifications and data subject to change Errors and omissions excepted...
Page 101: ...KM3 Modulator USER MANUAL M12927CA Rel 1 0 10 2020...
Page 102: ...M12927CA MOUNTING 2...
Page 118: ...1 RWF55 5X RWF55 6X User manual M12926CA Rel 0 1 10 2015...
Page 119: ...2 DEVICE INSTALLATION Fixing system Drilling dimensions...
Page 140: ......
Page 141: ...23 Note Specifications and data subject to change Errors and omissions excepted...