PART II: INSTALLATION
20
MultiBloc MBE
To mount the gas train, proceed as follows:
1) in case of threaded joints: use proper seals according to the gas used; in case of flanged joints: place a gasket between the ele-
ments;
2) fasten all the items by means of screws, according to the diagrams showed, observing the mounting direction for each item;
NOTE:
the bellows unit, the manual cutoff valve and the gaskets are not part of the standard supply.
ATTENTION: once the gas train is mounted according, the gas proving test mus be performed, according to the
procedure set by the laws in force.
ATTENTION: it is recommended to mount filter and gas valves to avoid that extraneous material drops inside the
valves, during maintenance and cleaning operation of the filters (both the filters outside the valves group and the
ones built-in the gas valves).
WARNING: Slowly open the fuel cock to avoid breaking the pressure regulator.
ALLA V. FARFALLA
GAS BRUCIATORE ø185
501939
PGMAX
PGCP
PGMIN
EV1
EV2
S
EV2
EV1
PGMAX
PGMAX
PGMIN
PGMIN
VD-R
VD-R
PS
PGCP
PGCP
VD-V
VD-V
VD-R
VD-V
PS
A
B
PS pressure sensor
Gas filter
Gas filter
Example of gas train MBE
Summary of Contents for HR1025
Page 46: ...PART IV MAINTENANCE 46 10 5 2 1 1 ...
Page 47: ......
Page 49: ...LME73 000Ax PME73 831AxBC LME73 831AxBC Service instruction manual M12921CB Rel 1 2 02 2016 ...
Page 71: ...23 ...
Page 72: ...Note Specifications and data subject to change Errors and omissions excepted ...
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......