![background image](http://html2.mh-extra.com/html/unicaterm/eco-6/eco-6_user-and-maintenance-manual_3709049039.webp)
E N G
5 . ) # ! 4 % 2 -
3 9
7.0
OFF
-
LOAD TESTING OPTION
To access the off load testing option: keep SET pressed for 2 seconds; press + and select the TS (TS =
test ) option; press SET to confirm. Use + to select password number “13” and press SET to confirm. This
will activate the off
-
load testing process, that is the activation of each component connected electronically
to the circuit board. To browse press +. Once the test has been completed, press ESC to exit. (An electronic
component testing tool is available. This can also issue a test report).
Test position
Parameter explanation
Measurement
Unit
C0
Test mode ready
//
C1
Igniter activation
//
C2
Combustion blower fan activation with encoder signal check
g/s
C3
Auger motor activation with electrical consumption check
A
C4
Convection blower activation
//
C5
Thermocouple temperature measurement
°C
C6
Combustive air flow sensor signal reading
Volt
C7
Room temperature probe reading
°C
Summary of Contents for ECO 6
Page 2: ...I T A 5 4 2 2...
Page 9: ...I T A 5 4 2 9 ECO 6 ECO 9...
Page 18: ...I T A 5 4 2 1 8 8 0 SCHEMA ELETTRICO...
Page 24: ...E N G 5 4 2 2 4...
Page 31: ...E N G 5 4 2 3 1 ECO 6 ECO 9...
Page 40: ...E N G 5 4 2 4 0 8 0 ELECTRIC SCHEME...
Page 46: ...D E U 5 4 2 4 6...
Page 53: ...D E U 5 4 2 5 3 ECO 6 ECO 9...